RRB Group D 2025 · 21 August 2026 · Shift 3
In January 2026, DRDO successfully tested its full-scale scramjet engine at the Scramjet Connect Pipe Test (SCPT) facility in Hyderabad. What was the key result of this test?
Think first, then check the answer.
Show the answer and explanation
✓ Correct answer: A. Long hypersonic engine run for over twelve minutes
In January 2026 DRDO ran its full-scale scramjet engine at the Scramjet Connect Pipe Test facility, Hyderabad, for over twelve minutes, a long hypersonic engine run that is key for hypersonic cruise missiles.
🗺️
This topic on the mind mapCurrent Affairs › Science, space and defence · 🔒 Full subject ₹99
Open the mind map⏱️
Take this whole paperRRB Group D 2025 · 21 August 2026 · Shift 3 · Practice or ⏱️ test mode: real exam time and marks · 📜 PYQ Pass
See the paperMore PYQs from this chapter
- In January 2026, the Ministry of Electronics and Information Technology (MeitY) launched "Param Shakti," an indigenously developed 3.1 Peta…RRB Group D 2025 · 3 August 2026 · Shift 2
- PSLV-C62 carrying EOS-N1 was launched in 2026 from which launch centre?RRB Group D 2025 · 3 August 2026 · Shift 2
- Which of the following indigenous anti-tank missile system did DRDO successfully test in January 2026?RRB Group D 2025 · 5 August 2026 · Shift 3
- On January 9, 2026, Defence Research and Development Laboratory successfully conducted a long- duration ground test of an Actively Cooled F…RRB Group D 2025 · 6 August 2026 · Shift 1
- Param Shakti Supercomputing facility, launched at Indian Institute of Technology (IIT) Madras in January 2026, is powered by which indigeno…RRB Group D 2025 · 6 August 2026 · Shift 2
